Airport Projects - Consultancies under Airport Authority Hong Kong as Lead / Architectural Consultants
DESIGN SERVICE TERM CONSULTANCIES
Subsequent to two consecutive term consultancies as sub-consultants, Design 2 (HK) Ltd has been serving as the lead consultant for four consecutive term consultancies under Airport Authority Hong Kong (since 2003 to present) with numerous assignments / service orders for interior design studies, statutory submissions, tender documentation, implementation etc for alterations and reconfigurations, etc for premises / facilities managed by the AAHK at the 2 passenger terminal buildings as well as other premises on the airport island. Design Service Term Contracts M855-5 (2012– 2014), M855 (2010 – 2012), M836-6 (2006 – 2010), M836 (2003-2006)
Client – Airport Authority Hong Kong
OTHER CONSULTANCIES
As lead / architectural consultants for various projects including the 7 new cabins at L7 of Terminal 1 under an extremely fast track programme in 2006, major alterations & additions to enhance the central link between Terminals 1 and 2 by providing new escalators and a new lift (2006), and enhancement work flight information display systems (2007).
Client – Airport Authority Hong Kong
Subsequent to two consecutive term consultancies as sub-consultants, Design 2 (HK) Ltd has been serving as the lead consultant for four consecutive term consultancies under Airport Authority Hong Kong (since 2003 to present) with numerous assignments / service orders for interior design studies, statutory submissions, tender documentation, implementation etc for alterations and reconfigurations, etc for premises / facilities managed by the AAHK at the 2 passenger terminal buildings as well as other premises on the airport island. Design Service Term Contracts M855-5 (2012– 2014), M855 (2010 – 2012), M836-6 (2006 – 2010), M836 (2003-2006)
Client – Airport Authority Hong Kong
OTHER CONSULTANCIES
As lead / architectural consultants for various projects including the 7 new cabins at L7 of Terminal 1 under an extremely fast track programme in 2006, major alterations & additions to enhance the central link between Terminals 1 and 2 by providing new escalators and a new lift (2006), and enhancement work flight information display systems (2007).
Client – Airport Authority Hong Kong






